Skip to content

Mon 26 OctKestrel Yard, Marlbridge

Demoweek 1 of 4

Items

IRS line · Façade

FA-02

Brick, panel and mortar specification

Open14 days lateDue 12/10Held by Farrow LuneDrawings: 0 of 2 issued (from Asite, synced 09:14)

Who is holding it up

Farrow Lune, Architect

“FLA”
Information Required Schedule, row 20, Required From · 19/10

Knock-on effects

No other item is held up by it.

Linked items

No linked items.

Chases drafted

To Daniel Okafor, Farrow Lune

FA-02: thanks for the preliminary brick, panel and mortar specification on 12/10. The IRS notes the final follows sample panel sign-off, with its date for you to confirm.

Open the draft

Drawings on Asite

0 of 2 issued · read-only, synced 09:14

  • KTY-FLA-ZZ-XX-SP-A-3020

    Brickwork and mortar specification

    For comment at P01, not issued

    12/10/2026 · Daniel Okafor

  • KTY-FLA-ZZ-XX-SP-A-3021

    Spandrel panel specification

    For comment at P01, not issued

    12/10/2026 · Daniel Okafor

Timeline

AI summary

Farrow Lune has issued a preliminary specification only; the final specification is to follow the sample panel (). The tracker notes that Farrow Lune (DO) is to confirm the date (). Separately, Farrow Lune has proposed changing the spandrel panels on elevations A and C to a pale grey powder-coat finish, with the brick and mortar staying as specified (). That proposal is with the client for review ().

October 2026

Actions and chases

  • Action · DTM 07, point 3.1 · Farrow Lune · overdue · due 12/10

    “Brick, panel and mortar specification (IRS FA-02): preliminary issue only. Final specification to follow the sample panel.”