Skip to content

Mon 26 OctKestrel Yard, Marlbridge

Demoweek 1 of 4

Items

IRS line · Concrete Frame and Core

FR-01

Core GA drawings and sections

ClosedDue 07/09Drawings: 3 of 3 issued (from Asite, synced 09:14)

Who is holding it up

Nobody is holding it up.

Knock-on effects

No other item is held up by it.

Linked items

No linked items.

Chases drafted

No chase drafted for this item.

Drawings on Asite

3 of 3 issued · read-only, synced 09:14

  • KTY-PEL-ZZ-ZZ-DR-S-1100

    Core general arrangement, levels 00 to 08

    Issued at C03

    04/09/2026 · Anna Kowalczyk

  • KTY-PEL-ZZ-01-DR-S-1101

    Core general arrangement, level 01 and transfer slab

    Issued at C02

    01/09/2026 · Anna Kowalczyk

  • KTY-PEL-ZZ-ZZ-DR-S-1150

    Core sections

    Issued at C02

    04/09/2026 · Anna Kowalczyk

Timeline

September 2026

Actions and chases

No action in the minutes and no chase sent on this item.