IRS line · Concrete Frame and Core
FR-04
Slab edge details and cast-in items, levels 04–08
OpenDue 30/11Held by PellamDrawings: 0 of 2 issued (from Asite, synced 09:14)
Who is holding it up
Pellam, Structural engineer
“Pellam Structures”
Knock-on effects
No other item is held up by it.
Linked items
No linked items.
Chases drafted
No chase drafted for this item.
Drawings on Asite
0 of 2 issued · read-only, synced 09:14
KTY-PEL-ZZ-ZZ-DR-S-1400
Slab edge details, levels 04 to 08
Planned, nothing issued
KTY-PEL-ZZ-ZZ-SH-S-1401
Cast-in items schedule, levels 04 to 08
Planned, nothing issued
Timeline
Nothing has been linked to this item yet.
Actions and chases
No action in the minutes and no chase sent on this item.