Skip to content

Mon 26 OctKestrel Yard, Marlbridge

Demoweek 1 of 4

Items

IRS line · Structural Steelwork

ST-01

Steel frame GA drawings, levels 01–08

ClosedDue 14/09Drawings: 3 of 3 issued (from Asite, synced 09:14)

Who is holding it up

Nobody is holding it up.

Knock-on effects

No other item is held up by it.

Linked items

No linked items.

Chases drafted

No chase drafted for this item.

Drawings on Asite

3 of 3 issued · read-only, synced 09:14

  • KTY-PEL-ZZ-ZZ-DR-S-2001

    Steel frame general arrangement, levels 01 to 07

    Issued at C03

    11/09/2026 · Mark Ellison

  • KTY-PEL-ZZ-ZZ-DR-S-2002

    Steel frame sections and elevations

    Issued at C02

    11/09/2026 · Mark Ellison

  • KTY-PEL-ZZ-ZZ-DR-S-2003

    Steel frame general arrangement, level 08 and roof

    Issued at C02

    11/09/2026 · Mark Ellison

Timeline

September 2026

Actions and chases

No action in the minutes and no chase sent on this item.