IRS line · Structural Steelwork
ST-01
Steel frame GA drawings, levels 01–08
ClosedDue 14/09Drawings: 3 of 3 issued (from Asite, synced 09:14)
Who is holding it up
Nobody is holding it up.
Knock-on effects
No other item is held up by it.
Linked items
No linked items.
Chases drafted
No chase drafted for this item.
Drawings on Asite
3 of 3 issued · read-only, synced 09:14
KTY-PEL-ZZ-ZZ-DR-S-2001
Steel frame general arrangement, levels 01 to 07
Issued at C03
11/09/2026 · Mark Ellison
KTY-PEL-ZZ-ZZ-DR-S-2002
Steel frame sections and elevations
Issued at C02
11/09/2026 · Mark Ellison
KTY-PEL-ZZ-ZZ-DR-S-2003
Steel frame general arrangement, level 08 and roof
Issued at C02
11/09/2026 · Mark Ellison
Timeline
September 2026
Actions and chases
No action in the minutes and no chase sent on this item.