Skip to content

Mon 26 OctKestrel Yard, Marlbridge

Demoweek 1 of 4

Trackers

Imported from Change Control Register.xlsx on 19/10/202613 rows

Download the original file

1 column hidden in your file: Drawing / Doc Ref

Select a cell to see where its value came from. Double-click it, or start typing, to edit it.

Halbrook Construction Ltd

Kestrel Yard, Marlbridge – Design Change Control Register

ABCDEFHIJKL
Row in your file
CR No.
Date Raised
Raised By
Package
Description of Change
Source
Cost Impact
Time Impact
Status
Instruction Ref
Comments
5CR-00103/08/2026Client (HD)Fit-outAdditional cycle store in the undercroft (24 spaces)Client letter£18,500NilInstructedEI-001
6CR-00214/08/2026Farrow LuneFaçadeWindow frame colour changed from black to bronzeDTM 03£4.5k est.NilINSTRUCTEDEI-002
7CR-00320/08/2026ClientFit-outRetail unit 3 handed over as a shell with capped services – no shopfront glazingEmail HD(£12,000) savingNilInstructedEI-003
8CR-00401/09/2026PellamFrameTransfer slab at level 01 thickened from 350 to 400 mmRFI-011TBCTBCAssessedQS pricing with Ostley
9CR-00507/09/2026Client (HD)BalconiesPlanters to the level 07 terracesDTM 05£9,2002 daysRejectedClient withdrew on cost
10CR-00621/09/2026Pellam (AK)SteelworkEdge beam on gridline A reduced to 356 UB to suit the window headRFI-004 / ST-02 (KTY-PEL-ZZ-ZZ-SH-S-2101 C02)NilNilRaised
12CR-00705/10/2026Farrow Lune (DO)FaçadeSoldier course over the shopfronts: blend B on a stainless steel support angleRFI-012TBCTBCWith QS
13CR-00809/10/2026Farrow LuneFaçadeSpandrel panels, elevations A and C: anodised bronze to pale grey powder-coatEmail DO 09/10TBCNilraisedClient reviewing – samples on site
14CR-00912/10/2026ClientFit-outBathroom pods omitted to type D flats – traditional buildRFI-009£2.1kNilAssessed
15CR-01013/10/2026NorthvaneM&ESmoke vent shaft enlarged for revised flat layoutRFI-013WithdrawnNo change needed – existing shaft adequate
16CR-011w/c 12/10Client (HD)RoofAccess stair instead of a hatch to the roof plant areaPhone callTBCTBC
17CR-01216/10/2026CorvaneSteelworkColumn splices moved to levels 03 and 06RFI-010NilNilAwaiting EI
18CR-01316/10/2026VelmoreFaçadeFaçade brackets changed to a thermally broken typeVelmore TQ-04£3,800NilWith QS