Halbrook Construction Ltd

Kestrel Yard, Marlbridge – Request for Information Register

ABCEFGHIJ
Row in your file
RFI No:
Date Issued:
Issued to / Action:
Package
Information Requested:
Date Information Required:
Response
Date Information Received:
Status
5RFI-00101/09/2026Pellam StructuresFrameConfirm concrete grade for core walls below level 01 – drawings show C32/40 and C40/50.08/09/2026C40/50 throughout core. Drawing to be revised at next issue.04/09/2026Closed
6RFI-00201/09/2026Arch – DOFit-outFloor-to-ceiling height in retail units – 3.6 m or 3.8 m?11/09/20263.8 m clear to underside of services zone.10/09/2026CLOSED
7RFI-00303/09/2026NorthvaneM&EConfirm weight of roof plant for frame design.17/09/2026See RF-03 loadings schedule.16/09/2026Closed
8RFI-00404/09/2026SE / ArchSteelworkEdge beam depth conflicts with window head height on elevation A. Please coordinate.18/09/2026Beam reduced to 356 UB. Window head unchanged.21/09/2026Closed
9RFI-00508/09/2026FLARoofUpstand height at roof outlets – 150 mm or 75 mm?15/09/2026Answered by email 18/09 – 150 mm upstand, see detail KTY-FLA-ZZ-R1-DR-A-4104.18/09/2026
Blank
10RFI-00608/09/2026Northvane (RP)M&EIncoming water main position – drawings disagree.22/09/2026Revised layout ME-03 (KTY-NVE-ZZ-00-DR-MEP-6301 C01).22/09/2026Closed - see email 12/10
11RFI-00710/09/2026Velmore FaçadesFaçadeConfirm curtain wall mullion spacing to suit flat layouts.24/09/20261500 mm typical; 1200 mm at stair core.23/09/2026
Answered
12RFI-00811/09/2026Pellam StructuresFrameTransfer slab thickness – 350 or 400 mm?18/09/2026Superseded by RFI-011.Superseded
13RFI-00914/09/2026Arch – LBFit-outBathroom pod or traditional build for type D flats?28/09/2026Traditional build – client preference.25/09/2026Closed
14RFI-01015/09/2026Corvane SteelSteelConfirm splice positions for columns C2–C6 to suit delivery lengths.29/09/2026Splices at level 03 and 06.28/09/2026
Resp rec'd
15RFI-01117/09/2026Pellam StructuresFrameTransfer slab thickness and punching shear reinforcement at core.01/10/2026400 mm with shear studs – see FR-02 (KTY-PEL-ZZ-ZZ-DR-S-1201 C02).30/09/2026Closed
16RFI-01221/09/2026Farrow LuneFaçadeSoldier course above shopfronts – drawings show brick blend A on a precast concrete boot. Confirm support detail and brick type.05/10/2026With Architect
17RFI-01322/09/2026NorthvaneM&ESmoke vent shaft size – does it need to grow for the revised flat layout?06/10/2026No change. Existing 1.0 m² shaft is adequate.02/10/2026Closed
18RFI-01407/10/2026Pellam Structures / NorthvaneSteelworkPrimary beams at the core: confirm the size and position of penetrations for the MEP risers so the connection details can be finalised (IRS ST-03).21/10/2026SE holding – riser sizes needed from Northvane before beam openings can be confirmed. ME 14/10Awaiting MEP info
19RFI-01524/09/2026ArchBalconiesBalcony soffit finish – render or cladding board?08/10/2026Cladding board, colour to match window frames.07/10/2026Closed
20RFI-01625/09/2026Client – HDFit-outIs retail unit 2 still to be let as a café? Affects extract route.09/10/2026
unit 2 will be let as a café, so it will need a kitchen extract
Answered
21RFI-01728/09/2026PellamSteelworkPlant support frame – steel or concrete upstands?12/10/2026Steel frame on concrete plinths.09/10/2026Closed
22RFI-01829/09/2026SEFrameStair landing connection to core wall – cast-in plate or resin anchors?13/10/2026Awaiting SE
24RFI-01930/09/2026VelmoreFaçadeCavity barrier positions at floor slabs – Velmore detail differs from architect’s.14/10/2026Velmore detail accepted by FLA.14/10/2026Closed
25RFI-02001/10/2026NorthvaneMEPMVHR unit location in type B flats clashes with storage cupboard.15/10/2026O/S
26RFI-02102/10/2026FLAFit-outLobby floor finish – porcelain tile or terrazzo?TBCopen
27RFI-02205/10/2026Pellam StructuresBalconiesThermal break product – is the specified one still acceptable at 2.1 m cantilever?19/10/2026
Confirmed: the heavier unit at all 2.1 m cantilevers
Answered
28RFI-02306/10/2026Arch – DORoofRoof access hatch or stair to plant area?20/10/2026Open
29RFI-02407/10/2026Farrow LuneFaçadeWindow reveal depth – 100 or 215 mm?21/10/2026
With Architect
30RFI-02508/10/2026Corvane SteelSteelworkCan the 610 UB at C1–C2 be delivered in one length (14.2 m)?ASAPYes – escorted load, 2 weeks' notice.12/10/2026
Resp rec'd
31RFI-02609/10/2026Northvane / PellamM&EDrainage run under core – sleeve through pile cap or reroute?23/10/2026O/S
32RFI-02712/10/2026FLAFit-outFlat entrance doors: confirm fire rating and whether vision panels are needed.26/10/2026Awaiting response
33RFI-02813/10/2026Arch – LBFaçadeBrick bond at parapet – stretcher bond as drawn, or Flemish bond to match ground floor?27/10/2026With Architect
34RFI-02914/10/2026PellamSteelworkSecondary beam notch at gridline D4 – confirm acceptable.28/10/2026Awaiting SE
35RFI-03015/10/2026ClientFit-outPenthouse kitchen upgrade – proceed with standard spec until client decision?29/10/2026Awaiting response
36RFI-03116/10/2026Northvane (CD)M&ERiser R1 access panels – fire rating and size?30/10/2026O/S